BIM at maximum power in the design phase

When we work on electromechanical installation projects in BIM.

At JG Ingenieros we want to guarantee the highest quality and consistency in the design, and at the same time have the maximum possible information internalized in the model.

Jaume Cera Botet , our corporate director of the facilities engineering area, shares the experience of JG.